![]() |
Spanish - French - Portugese |
The raw materials used to produce cement are limestone and clays. The plant has two quarries, a limestone quarry and a shale quarry, five kilometres apart and joined to the factory by a private road.
|
Grinding the limestone and shale. |
Grinding limestone and shale taken from the quarries is done next to the source, and then transported in trucks to the storage area. |
|
|
Storage Area |
The raw material’s Storage Area includes a single warehouse divided into two sections to store different materials (limestone, shale, sand, pyrite and calcium sulphate) in piles stretching lengthwise. It is covered to avoid emitting dust into the atmosphere and to protect the material from atmospheric conditions. |
|
|
Milling the material |
The purpose of milling is to reduce the size of raw material’s particles in order to properly execute the chemical reactions in the kiln.
|
|
|
Producing clinker |
The raw powder is entered into a heat exchanger where the progressive heating process takes place, reaching 1,000 ºC. The raw material is heated with kiln gases before actually entering it, this way it does not have to be inside so long, thus saving energy.
|
|
|
Storage and Delivery |
|
|
|
Sacking |
|
|